Providing Boiler capacity of 5T/h for Habeco Thai Binh Factory.
Date post: 06/03/2023 12:30 PM

Article Content

    PROJECT DETAILS

    Location: Hanoi Beer – Alcohol – Beverage Corporation – Thai Binh Industrial Park
    Investor: Kim Truong Phuc Company Limited
    Scale: 5 tons/hour
    Project: Supplying and installing one boiler 5T/h HABECO- Thai Binh
    Expected Completion time: September, 2020
    Main contractor: PHUC TRUONG HAI BOILER CO., LTD

     

    VPTH Boiler employees have been working very hard to ensure the steam supply system for factory on time and on schedule as expected completion project requiring within 70 days.

    The boiler capacity of 5T/h system for Habeco Thai Binh Beer factory is transferred with a working pressure of 8bar with boiler efficiency reaching 85% of capacity. The main fuel of this system is Biomass: fresh sawdust, industrial waste (scrap, shoe soles, sponge), craft village humus, rice husks, wood chips…
    PTH Boiler always wants to bring satisfaction to each customer from efficiency working to environmental friendliness go along with the PTH boiler system in the spirit of constantly learning and improving knowledge to improve skills.

    • Thông tin liên hệ:
    • Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
    • Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn

    Related Articles