2017
2018
2019
PROJECT DETAIL
Location Vo Van Bich Street - Hamlet 8 - Binh My Commune - Cu Chi District - HCMC
Investor Loc An Food Company Limited
Scale: Provide two boiler systems: 5 tons/h and 3 tons/h
Fuel: Biomas (sawdust, shavings, rice husks ...)
Expected Completion Time: 2019
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
Website: phuctruonghai.vn
In Nov 2019, PTH BOILER as the main contractor, continued to cooperate with the investor, Loc An Food Company, to transport and erect two industrial boilers of 5 tons/h and 3 tons/h respectively, and with design pressure of 5Bar, using Biomas of fuel.
It is expected that two projects will be completed and get ready to use on 30 November, 2019.
- Thông tin liên hệ:
- Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
- Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn
- Thông tin liên hệ:
- Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
- Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn
2020
Location: Factory Miza Corporation
Investor: Kim Truong Phuc Company Limited
Scale: 40 tons / hour
Project: Supplying and installing one boiler 40T/h MIZA PAPER – THANH HOA
Expected Completion time: It is expected that in mid-November, 2020, acceptance, hand-over and put into use.
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
Lò hơi 40T/h sẽ được gia công chế tạo tại chân công trình nhà máy Miza Thanh Hóa. Sau 3 tháng làm việc và lắp đặt , chuyển giao hệ thống sẽ dự kiến cấp hơi chính thức vào ngày 11/11/2020.
Boiler capacity of 40T/h will be fabricated and made in Miza Thanh Hoa factory. After 3 months of working and installing, transferring the system will be scheduled for official steam supply on 11/11/2020.
The main equipment was created by PTH Boiler workers under the typical sunshine and wind of the central VietNam in the last days of summer. After a month of hard work, skilled craftsmen created the important equipment of the boiler system such as a ballast, and the combustion chamber. During 40 degree Celsius weather.
Phúc Trường Hải thiết kế và chế tạo lò hơi trên tiêu chí chất lượng mang lại hiệu quả cho mỗi khách hàng. Mỗi hệ thống lò hơi chúng tôi cung cấp được tạo ra từ công sức và tâm huyết của từng cá nhân công nhân viên Phúc Trường Hải nhằm mang đến sự hài lòng nhất cho mỗi khách hàng.
Mỹ Hậu.
Location: Factory MNS FEED NGHE AN CO., LTD
Zone C, Nam Cam Industrial Park, Southeast Nghe An Economic Zone, Nghi Xa Ward, Nghi Loc District, Nghe An Province.
Investor: MNS FEED Nghe An Company Limited
Scale: Boiler 6 tons/hour
Project: Supplying boiler 6 tons/h Anco Nghe An
Expected Completion time: 12/2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
In mid-August 2020, PTH Boiler has a chance to continue to cooperate with International Agricultural Nutrition Joint Stock Company (ANCO) while developing boiler project for the MNS FEED Nghe An factory.
PTH Boiler designed, manufactured and supplied the boiler system, water pipes with a capacity of 6 tons/hour. Working pressure 10bar, the calorific value supplied to the production line reaches approximately 200 degrees Celsius
Anco Nghe An boiler also uses Biomass (rice husk, sawdust) fuel because of the economic benefits over the previous boiler system.
The project is expected to be completed and officially operational in mid-December 2020.
Thông tin liên hệ:
Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
Email: info@phuctruonghai.vn
Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn
PROJECT DETAILS
Location: KUMHO- Binh Duong Company
Investor: Kumho Tire Vietnam
Scale: 18 tons of steam/hour
Project: Supplying and installing one boiler 18T/h
Expected Completion time: September 2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
PTH Boiler is honored to have confidence and the opportunity to cooperate with KUMHO TIRE Vietnam. KUMHO TIRE is an affiliated company of KUMHO ASIANA Korea Group, specialized in manufacturing and supplying tires with 9 factories spread over the world. PTH Boiler capacity of 18 tons/h fabricated and installed at Kumho Tire Binh Duong factory.
The boiler capacity of 18 tons/h project for Kumho Binh Duong is the boiler, water pipe, 4 passes. Designed capacity of 18 tons steam/h, fuel used by wood pellets 160-180kg/ton of heat generated expected 4095kcal/kg.
With many years of experience in the field of manufacturing, PTH boiler has been gradually asserting a firm position in the boiler industry. New technology is always updated with professionalism in each project along with experienced workers. We always meet and satisfy the needs for our customers.
Since beginning the project, our technical staff has been focused on designing and updating its’ implementation of the most optimal technology for the Kumho boiler system. In addition, to ensure the progress of the steam supply of factory, our production department and all workers at the factory have worked hard to meet the progress requirements of customers.
After 5 months of working, at the beginning of August 2020, PTH Boiler completed the instruction on operating and transferring the 18 tons/h boiler system to be ready for the steam supply factor. Kumho Tire is a large company with strict requirements of operation, input, output of the whole boiler system.
Therefore, the combination between PTH Boiler and Kumho Vietnam Company is not only meaningful for the long-term cooperation in the future, but also to go up and develop together.
For PTH Boiler, this project is a step to complete and become bigger than ever.
For Kumho Vietnam, this project is a real economic problem with high efficiency.
PROJECT DETAILS
Location: Hanoi Beer – Alcohol – Beverage Corporation – Thai Binh Industrial Park
Investor: Kim Truong Phuc Company Limited
Scale: 5 tons/hour
Project: Supplying and installing one boiler 5T/h HABECO- Thai Binh
Expected Completion time: September, 2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
VPTH Boiler employees have been working very hard to ensure the steam supply system for factory on time and on schedule as expected completion project requiring within 70 days.
The boiler capacity of 5T/h system for Habeco Thai Binh Beer factory is transferred with a working pressure of 8bar with boiler efficiency reaching 85% of capacity. The main fuel of this system is Biomass: fresh sawdust, industrial waste (scrap, shoe soles, sponge), craft village humus, rice husks, wood chips…
PTH Boiler always wants to bring satisfaction to each customer from efficiency working to environmental friendliness go along with the PTH boiler system in the spirit of constantly learning and improving knowledge to improve skills.
PROJECT DETAILS
Location: KUMHO- Binh Duong Company
Investor: Kumho Tire Vietnam
Scale: 18 tons of steam/hour
Project: Supplying and installing one boiler 18T/h
Expected Completion time: September 2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL signed at the time of Coronavirus epidemic in Vietnam with complicated development. However, with hard working and expertise in new technologies of manufacturing, PTH Boiler has received the trust of Joyful Co., Ltd. and promoted cooperation on the oil furnace project.
Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL is a horizontal furnace – 3 smoke bass with a design pressure of 7kg/cm2, expected to reach 85% when it is in operation stage. We are committed that the output of the factory be in accordance with standards such as environmental, noise standards …
Overview image of Joyful construction factory where 4 million kcal thermal oil Boiler is installed.
The project implementation process is sensitive in the time of the Coronavirus epidemic, but PTH Boiler has actively prevented the epidemic and followed the recommendations of the Ministry of Health. All staff always wear face masks, wash their hands, disinfect and measure their temperature before coming to work.
All PTH Boiler staff have been really serious regarding Corona virus prevention during production. As a result, the thermal oil boiler capacity of 4 million kcal project has reached the final stages to get ready for use. It is expected to be completed with delivery to customers in early October 2020.
We expect the Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL will mark a milestone as the beginning of a long-term cooperation between Joyful Co., Ltd. and PTH Boiler.
Thông tin liên hệ:
Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
Email: info@phuctruonghai.vn
Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn
PROJECT DETAIL
Location: Lot B2, B3, B4, B5 Nhon Hoa Industrial Park, Nhon Hoa Ward, An Nhon Town, Binh Dinh Province
Investor: JAPFA COMFEED VN CO., LTD - BINH DINH Branch
Scale: 5 TONS/H CAPACITY BIOMASS BOILER
Design pressure: 12 Bar
Burning fuel: Biomass
Expected completion time: May 30, 2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
The quality of products and customer services at Phuc Truong Hai Boiler Co., Ltd has been verified by many domestic and international partners and trusted with a series of orders.
PTH Boiler has designed, constructed and installed boilers of many different scales.
PTH Boiler’s products have been installed in North, Central and South with high quality and good services.
Coronavirus pandemic has caused many negative effects on the economy, but PTH Boiler has provided products of good quality and always on time to meet our partners and customers expectation.
PROJECT DETAIL
Investor: HAI LONG HUNG YEN JOINT STOCK COMPANY
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
Location: Xuan Dao Hamlet, Xuan Duc Commune, My Hao Town, Hung Yen Province.
Design capacity: 6 Tons/h (6,000 Kg/h)
Expected Completion time: 70 working days
Design pressure: 12 Bar
Durable test pressure: 18 Bar
Maximum working pressure: 8 Bar
PTH Boiler provides the boiler capacity of 6 ton/h for Hai Long-Hung Yen brewery. This project marks a long-term cooperation between Phuc Truong Hai Boiler and Hai Long Hung Yen Joint Stock Company.
PTH Boiler achieved the expected completion in 70 working days, based on more than 10 years of experience operating in the field of manufacturing and installing boilers.
PROJECT DETAIL
Investor: PROCONCO CAN THO ONE MEMBER CO., LTD
Location: LOT 13-14, TRA NOC 1 INDUSTRIAL PARK, TEA NOC Ward, BINH THUY DISTRICT, CAN THO City.
Scales: BOILER 15 TONS/H CAPACITY
Design pressure: 12 Bar
Burning fuelst: Biomass, than InDo,…
Expected completion time: April 30, 2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
Phuc Truong Hai Boiler Co., Ltd. has maintained a good impression on customers and partners during the past many years. Following the success of 2019, the company has cooperated with partners outside of the region, creating confidence for customers in many regions across the country. South Western region has potential in the areas of economy, business, and knowledge.
Can Tho is the one of young and beautiful city in the south western region. Phuc Truong Hai Co., Ltd. was fortunate to cooperate with Proconco Can Tho One Member Company Limited in the installation of the boiler capacity of 15T/h. The boiler is manufactured according to ASME – 2017 standards (Section I), and the exhaust gas into the environment ensures the current emission standards QCVN 19: 2009/BTNMT.
PTH Boiler maintains responsibility for materials quality requirements and engineering of project. We are confident that we earned the satisfaction of the Proconco Can Tho Company Limited while doing the construction and production of the Boiler capacity of 15T/H.
PTH Boiler staff has been constructing and making progress toward completion of the project. As planned, the project will be completed and ready to use on 30 April, 2020 at Lot 13-14, Tra Noc 1 Industrial Park, Tra Noc Ward, Binh Thuy District, City. Can Tho.
PTH Boiler is very pleased to cooperate with Proconco Can Tho One Member Company Limited as well as domestic and foreign customers for investment, construction and construction.
2021