    2020

    Location: Factory Miza Corporation
    Investor: Kim Truong Phuc Company Limited
    Scale: 40 tons / hour
    Project: Supplying and installing one boiler 40T/h MIZA PAPER – THANH HOA
    Expected Completion time: It is expected that in mid-November, 2020, acceptance, hand-over and put into use.
    Main contractor: PHUC TRUONG HAI BOILER CO., LTD

     

    Lò hơi 40T/h sẽ được gia công chế tạo tại chân công trình nhà máy Miza Thanh Hóa. Sau 3 tháng làm việc và lắp đặt , chuyển giao hệ thống sẽ dự kiến cấp hơi chính thức vào ngày 11/11/2020.

    Boiler capacity of 40T/h will be fabricated and made in Miza Thanh Hoa factory. After 3 months of working and installing, transferring the system will be scheduled for official steam supply on 11/11/2020.

    The main equipment was created by PTH Boiler workers under the typical sunshine and wind of the central VietNam in the last days of summer. After a month of hard work, skilled craftsmen created the important equipment of the boiler system such as a ballast, and the combustion chamber. During 40 degree Celsius weather.

    Phúc Trường Hải thiết kế và chế tạo lò hơi trên tiêu chí chất lượng mang lại hiệu quả cho mỗi khách hàng. Mỗi hệ thống lò hơi chúng tôi cung cấp được tạo ra từ công sức và tâm huyết của từng cá nhân công nhân viên Phúc Trường Hải nhằm mang đến sự hài lòng nhất cho mỗi khách hàng.

     

    • Thông tin liên hệ:
    • Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
    • Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn

    Mỹ Hậu.

     

    PROJECT DETAILS

    Location: Hanoi Beer – Alcohol – Beverage Corporation – Thai Binh Industrial Park
    Investor: Kim Truong Phuc Company Limited
    Scale: 5 tons/hour
    Project: Supplying and installing one boiler 5T/h HABECO- Thai Binh
    Expected Completion time: September, 2020
    Main contractor: PHUC TRUONG HAI BOILER CO., LTD

     

    VPTH Boiler employees have been working very hard to ensure the steam supply system for factory on time and on schedule as expected completion project requiring within 70 days.

    The boiler capacity of 5T/h system for Habeco Thai Binh Beer factory is transferred with a working pressure of 8bar with boiler efficiency reaching 85% of capacity. The main fuel of this system is Biomass: fresh sawdust, industrial waste (scrap, shoe soles, sponge), craft village humus, rice husks, wood chips…
    PTH Boiler always wants to bring satisfaction to each customer from efficiency working to environmental friendliness go along with the PTH boiler system in the spirit of constantly learning and improving knowledge to improve skills.

    • Thông tin liên hệ:
    • Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
    • Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn

    PROJECT DETAILS

    Location: KUMHO- Binh Duong Company
    Investor: Kumho Tire Vietnam
    Scale: 18 tons of steam/hour
    Project: Supplying and installing one boiler 18T/h
    Expected Completion time: September 2020
    Main contractor: PHUC TRUONG HAI BOILER CO., LTD

    Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL signed at the time of Coronavirus epidemic in Vietnam with complicated development. However, with hard working and expertise in new technologies of manufacturing, PTH Boiler has received the trust of Joyful Co., Ltd. and promoted cooperation on the oil furnace project.

    Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL is a horizontal furnace – 3 smoke bass with a design pressure of 7kg/cm2, expected to reach 85% when it is in operation stage. We are committed that the output of the factory be in accordance with standards such as environmental, noise standards …

    Overview image of Joyful construction factory where 4 million kcal thermal oil Boiler is installed.

    The project implementation process is sensitive in the time of the Coronavirus epidemic, but PTH Boiler has actively prevented the epidemic and followed the recommendations of the Ministry of Health. All staff always wear face masks, wash their hands, disinfect and measure their temperature before coming to work.

    All PTH Boiler staff have been really serious regarding Corona virus prevention during production. As a result, the thermal oil boiler capacity of 4 million kcal project has reached the final stages to get ready for use. It is expected to be completed with delivery to customers in early October 2020.

    We expect the Thermal Oil Boiler capacity of 4Million Kcal project for JOYFUL will mark a milestone as the beginning of a long-term cooperation between Joyful Co., Ltd. and PTH Boiler.

    Thông tin liên hệ: 

    Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai

    Email: info@phuctruonghai.vn

    Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn

    Phục vụ nhóm ngành       : Thực Phẩm (Bia)

    Công suất nhiệt                : 6TpH_8Bar

    Công nghệ lò đốt              : Buồng đốt tầng sôi.

    Nhiên liệu sử dụng           : Biomass hỗn hợp.

    Lắp đặt tại                         : Hưng Yên

    Phục vụ nhóm ngành       : Thức ăn chăn nuôi

    Công suất nhiệt                : 15TpH_8Bar

    Công nghệ lò đốt              : Buồng đốt tầng sôi.

    Nhiên liệu sử dụng           : Biomass hỗn hợp.

    Lắp đặt tại                         : Cần Thơ