Article Content
Location: Factory MNS FEED NGHE AN CO., LTD
Zone C, Nam Cam Industrial Park, Southeast Nghe An Economic Zone, Nghi Xa Ward, Nghi Loc District, Nghe An Province.
Investor: MNS FEED Nghe An Company Limited
Scale: Boiler 6 tons/hour
Project: Supplying boiler 6 tons/h Anco Nghe An
Expected Completion time: 12/2020
Main contractor: PHUC TRUONG HAI BOILER CO., LTD
In mid-August 2020, PTH Boiler has a chance to continue to cooperate with International Agricultural Nutrition Joint Stock Company (ANCO) while developing boiler project for the MNS FEED Nghe An factory.
PTH Boiler designed, manufactured and supplied the boiler system, water pipes with a capacity of 6 tons/hour. Working pressure 10bar, the calorific value supplied to the production line reaches approximately 200 degrees Celsius
Anco Nghe An boiler also uses Biomass (rice husk, sawdust) fuel because of the economic benefits over the previous boiler system.
The project is expected to be completed and officially operational in mid-December 2020.
Thông tin liên hệ:
Trụ sở Công ty: Số 28/88, Khu Phố 13, Phường Hố Nai, TP. Biên Hoà,Tỉnh Đồng Nai
Email: info@phuctruonghai.vn
Webside: http://noihoitangsoi.vn hoặc http://phuctruonghaivn
Related Articles