Providing Boiler capacity of 6T/h project in Hung Yen
Date post: 06/03/2023 01:42 PM

Article Content

    PROJECT DETAIL

    Investor: HAI LONG HUNG YEN JOINT STOCK COMPANY

    Main contractor: PHUC TRUONG HAI BOILER CO., LTD

    Location: Xuan Dao Hamlet, Xuan Duc Commune, My Hao Town, Hung Yen Province.

    Design capacity: 6 Tons/h (6,000 Kg/h)

    Expected Completion time: 70 working days

     Design pressure: 12 Bar

    Durable test pressure: 18 Bar

    Maximum working pressure: 8 Bar

        PTH Boiler provides the boiler capacity of 6 ton/h for Hai Long-Hung Yen brewery. This project marks a long-term cooperation between Phuc Truong Hai Boiler and Hai Long Hung Yen Joint Stock Company.

        PTH Boiler achieved the expected completion in 70 working days, based on more than 10 years of experience operating in the field of manufacturing and installing boilers.