Article Content

Bringing a large-capacity industrial boiler system into safe and efficient operation requires a fully integrated execution process, precise engineering, and strict quality control at every stage. Recently, Phuc Truong Hai Co., Ltd. (PTH Boiler) successfully completed and delivered a turnkey 16 T/H Biomass Steam Supply System featuring a Step Grate Boiler.

Engineering & Manufacturing: Optimized for maximum thermal efficiency while meeting the most stringent engineering and quality standards.
Transportation & Installation: Every parameter was executed with precision to ensure the highest level of safety throughout the installation process.


Inspection, Commissioning & Handover: Successfully tested under actual operating conditions and ready to provide a stable, reliable, and sustainable green steam supply for the plant.
The successful completion of this project once again demonstrates PTH Boiler's comprehensive engineering capabilities and proven expertise in delivering industrial boiler systems and biomass energy solutions.
We sincerely thank our valued Customers and Partners for placing their trust in PTH Boiler as your reliable partner. We remain committed to delivering safe, efficient, and sustainable thermal solutions, empowering industries to enhance productivity while advancing toward their Net Zero goals.
Related Articles
25 Sep, 2025
MID-AUTUMN BONDING - SHARING LOVE AT PHUC TRUONG HAI
04 Nov, 2025
SHARING TRUST - NURTURING KNOWLEDGE
03 Dec, 2025
PHUC TRUONG HAI PARTICIPATES IN THE 2025 ENERGY EFFICIENCY AND GREEN TRANSITION EXHIBITION
10 Feb, 2026
PHUC TRUONG HAI YEAR-END PARTY 2025 – HONORING THE FIRE KEEPERS, CONTINUING THE JOURNEY OF DEVELOPMENT
20 May, 2026
PHUC TRUONG HAI CONDUCTS 6G WELDING SKILL ASSESSMENT: READY FOR NEW PROJECT DEPLOYMENT
02 Jun, 2026
5S Standards at Phuc Truong Hai Workshop: Small Discipline, Great Value
27 Jun, 2026
A Sincere Thank You From Phuc Truong Hai – Closing An Emotion-Filled Journey At Denimsandjeans Vietnam 2026
30 Jun, 2026
[PROJECT UPDATE] On-Site Erection and Installation Progress of the 16 T/H Step Grate Boiler System
18 Jul, 2026
PTH Boiler 15th Anniversary Celebration (2011–2026)
10 Sep, 2026
ANOTHER “ENERGY HEART” SUCCESSFULLY COMPLETED BY PHUC TRUONG HAI
29 Sep, 2026
CONTINUING OUR JOURNEY OF SUPPORTING THE NEXT GENERATION
09 Oct, 2026
SPORTS DAY 2026
19 Nov, 2026
