PHUC TRUONG HAI CONDUCTS 6G WELDING SKILL ASSESSMENT: READY FOR NEW PROJECT DEPLOYMENT
Ngày đăng: 20/05/2026 04:21 PM

Article Content

    To ensure the best possible preparation for upcoming key industrial boiler projects, Phuc Truong Hai’s Quality Assurance/Quality Control (QA/QC) department, in coordination with the Workshop Management Board, recently organized a rigorous skill assessment for the company's high-pressure welders right at the manufacturing plant.

    6G Standards – A Commitment Built on High-Pressure Weld Seams

    6G welding (welding pipes at a fixed 45-degree incline) is recognized as one of the most challenging levels in pressure welding technology. At Phuc Truong Hai, this has become a mandatory standard for all welders directly involved in fabricating pressure vessels, waterwall systems, and boiler heat-resistant components.

    The assessment does not just evaluate the accuracy, penetration, and uniformity of the weld seams under the direct supervision of the QC team; it also demands absolute patience and ultimate focus from the craftsman behind the protective welding shield.

    Transparent Processes, Guaranteed Absolute Quality

    Upon completion, all actual test pieces undergo strict non-destructive testing (NDT), including Ultrasonic Testing (UT) and Radiographic Testing (RT). Phuc Truong Hai firmly commits to:

    • 100% of welders deployed to actual projects must pass this rigorous qualification test and hold valid high-pressure welding certifications.

    • All skill assessment data and welding logs are systematically archived, ready to demonstrate actual execution capacity to project owners and independent third-party inspection agencies.

    "Our thoroughness and strictness in workforce preparation before pushing the project start button form the very foundation that allows Phuc Truong Hai to confidently deliver boiler systems that operate durably, with absolute safety, and optimal energy efficiency for every partner."

    The intense focus and high sense of responsibility demonstrated by our workshop personnel serve as the strongest affirmation of the PTH Boiler brand quality across every single energy project.

    Related Articles

    25 Sep, 2025

    MID-AUTUMN BONDING - SHARING LOVE AT PHUC TRUONG HAI

    Mid-Autumn Festival is not only a time for family reunion, but also an occasion to share love and strengthen team spirit. Embracing this warm atmosphere, the Board of Directors of Phuc Truong Hai Co., Ltd. presented meaningful Mid-Autumn gifts to all workers.

    04 Nov, 2025

    SHARING TRUST - NURTURING KNOWLEDGE

    Phuc Truong Hai accompanies Polytechnic students on their journey to pursue dreams Throughout more than thirteen years of development, Phuc Truong Hai Co., Ltd. has always believed that the sustainable value of a business lies not only in its economic achievements, but also in the positive impact it creates for the community.

    03 Dec, 2025

    PHUC TRUONG HAI PARTICIPATES IN THE 2025 ENERGY EFFICIENCY AND GREEN TRANSITION EXHIBITION

    Recently, Phuc Truong Hai Co., Ltd. (PTH Boiler) was honored to participate in the 2025 Energy Efficiency and Green Transition Exhibition, organized by the Ministry of Industry and Trade in Hanoi. The exhibition brought together leading enterprises from across the industrial sector, showcasing innovative technologies and advanced solutions in energy efficiency, green transformation, and sustainable industrial development.

    10 Feb, 2026

    PHUC TRUONG HAI YEAR-END PARTY 2025 – HONORING THE FIRE KEEPERS, CONTINUING THE JOURNEY OF DEVELOPMENT

    “Igniting 2026 – Ready for a New Journey” Closing a year marked by many memorable milestones, Phuc Truong Hai enters 2026 with confidence, proactiveness, and a strong commitment to innovation. The spirit and dedication nurtured throughout 2025 will continue to drive PTH forward, delivering sustainable value to our customers and partners in the journey ahead.

    02 Jun, 2026

    5S Standards at Phuc Truong Hai Workshop: Small Discipline, Great Value

    In the heavy machinery and pressure equipment manufacturing industry, an organized workspace is the cornerstone of precision and absolute safety. At Phuc Truong Hai, the 5S standard (Sort - Set in order - Shine - Standardize - Sustain) is far from a mere slogan; it is our core culture and the ultimate yardstick for our team's discipline.

    27 Jun, 2026

    A Sincere Thank You From Phuc Truong Hai – Closing An Emotion-Filled Journey At Denimsandjeans Vietnam 2026

    The two days of the Denimsandjeans Vietnam 2026 Exhibition (June 24 - 25, 2026) have flown by, but the valuable conversations, meaningful insights, and trust that our Customers and Partners placed in Phuc Truong Hai (PTH Boiler) remain deeply valuable.

    30 Jun, 2026

    [PROJECT UPDATE] On-Site Erection and Installation Progress of the 16 T/H Step Grate Boiler System

    In the final days of June 2026, construction activities at PTH Boiler’s latest project site are in full swing. Our team is fully committed to one of the most critical phases of the project—the erection and installation of a high-capacity 16 T/H Step Grate Boiler System. Every activity is being executed with precision and strict adherence to the project schedule, ensuring this "heart of the energy system" is ready for on-time commissioning and handover to the customer.

    18 Jul, 2026

    PTH Boiler 15th Anniversary Celebration (2011–2026)

    The 15th Anniversary Celebration of Phuc Truong Hai Co., Ltd. (PTH Boiler) was successfully held with the distinguished presence of the Company's Board of Directors, valued Customers, trusted Business Partners, and all employees.

    21 Jul, 2026

    [PROJECT] The Journey to Delivering a 16 T/H Biomass Steam Supply System – Step Grate Boiler

    Bringing a large-capacity industrial boiler system into safe and efficient operation requires a fully integrated execution process, precise engineering, and strict quality control at every stage. Recently, Phuc Truong Hai Co., Ltd. (PTH Boiler) successfully completed and delivered a turnkey 16 T/H Biomass Steam Supply System featuring a Step Grate Boiler.

    10 Sep, 2026

    ANOTHER “ENERGY HEART” SUCCESSFULLY COMPLETED BY PHUC TRUONG HAI

    Recently, Phuc Truong Hai successfully completed, delivered, and installed a 6 T/H fluidized-bed boiler in Dong Thap, ready for commissioning and steam generation to support the customer’s production requirements.

    29 Sep, 2026

    CONTINUING OUR JOURNEY OF SUPPORTING THE NEXT GENERATION

    As part of our annual commitment, Phuc Truong Hai continues to provide scholarships to students of the University of Technology, offering encouragement and support as they pursue their academic journey and future aspirations.

    09 Oct, 2026

    SPORTS DAY 2026

    Recently, companies across our shared ecosystem came together for the annual Sports Day, a meaningful event held to celebrate the anniversary while providing an opportunity for employees to connect, build relationships and strengthen team spirit.

    19 Nov, 2026

    PROJECT INSTALLATION UPDATE | INDUSTRIAL BOILER PROJECTS BY PHUC TRUONG HAI

    From equipment fabrication at our manufacturing facility to on-site installation, Phuc Truong Hai places strong emphasis on every stage of project execution to ensure quality and compliance with technical requirements.